Browse, purchase, and download bid documents for active Rye Engineering projects. Use your Quest number or project/bid number to search.
| Bid No. | Project Name | Project Location | Bid Opening Location | Bid Due Date | Owner |
|---|---|---|---|---|---|
| KE-2026-1 | Kauffman Engineering, LLC Restroom Addition & Interior Alteration | 1350 Highway 149, Cumberland City, TN 37050 | 1350 Highway 149, Cumberland City, TN 37050 | Thursday, October 22nd, 2026, 2:00 AM CDT | Kauffman Engineering, LLC |
| TNR-2026-1 | Tennessee Ridge Highway 147 Directional Bore | Highway 147, Tennessee Ridge, TN 37178 | 2300 S Main St, Tennessee Ridge, TN 37178 | Wednesday, October 21st, 2026, 2:00 PM CDT | City of Tennessee Ridge |
No purchases found for this item.
| Company | Purchaser Name | Phone | |
|---|---|---|---|
| Mofield Brothers Construction Co., LLC | Mike Mofield | — | mike.mofieldbros@gmail.com |
| Moss Welding LLC | Dalton Moss | (615) 681-2826 | daltonmosswelding@gmail.com |
| T.J.CONSTRUCTION, INC. | Lisa Childers | (256) 718-2041 | tjconstal@comcast.net |
| MRC Underground Utilities llc | Mark Rowe | (615) 517-7338 | mark-rowe-const@att.net |
| Parchman Construction Company Inc. | Ed Gauthier | (931) 206-6023 | egauthier@parchmanconstruction.com |
| Bid Number | Project Name | Description | Bid Date | Awarded Bidder | Dollar Amount Awarded | Download Results |
|---|---|---|---|---|---|---|
| D-2024-4 | 2023 CDBG Dover Asphalt Reconstruction and Overlay | Asphalt overlay of approximately 2,426 feet of streets in the Town of Dover. | 01/30/2025 | Pavement Restorations, Inc. | $165,409.00 | Download Results |
| J-2026-1 | 2024 ARC Grant Jamestown Tank Rehabilitation | Rehabilitation of a 1,000,000 gallon Fluted Column Elevated Storage Tank (City Hall Tank) that involves repainting all interior and exterior surfaces, replacement of issues that currently exist on the tank, and replacement of tank lighting. | 05/05/2026 | G&L Tank Sandblasting and Coatings, LLC | $985,150.00 | Download Results |
| A-2024-1 | 2024 ARPA Ardmore Collection System | Installation of approximately 1,200 LF of 10” Gravity Sewer, rehabilitation of approximately 3,900 LF of gravity sewer via Cured in Place Pipe (CIPP), lining of roughly 20 manholes with Cementous epoxy, and the rehabilitation of 3 submersible lift stations in Ardmore, TN. | 12/03/2024 | PipeWorks Plus, Inc. | $1,899,596.20 | Download Results |
| E-2025-1 | 2024 ARPA City of Erin Transmission Line | Replacment of approximately 14,740 feet of 12-inch DIP transmission main along SR-149. | 05/29/2025 | Parchman Construction Company, Inc. | $1,355,285.55 | Download Results |
| CC-2025-2 | 2024 ARPA Cumberland City Sewer System Improvements | Rehabilitation of one sanitary sewer lift station, two wastewater lagoons that have experienced erosion, approximately 1,722 LF of gravity sewer via Cured in Place Pipe (CIPP), and the potential to line another 1,400 ft & up to 24 manholes with Cementous epoxy in The Town of Cumberland City, TN. | 06/10/2025 | Parchman Construction Company, Inc. | $448,390.66 | Download Results |
| CC-2025-1 | 2024 ARPA Cumberland City Water System Improvements | Abandoning two sections of old 6” water main attached to the side of two bridges in The Town of Cumberland City. | 06/10/2025 | No Bidder Selected | N/A | Download Results |
| CC-20261 | 2024 ARPA Cumberland City Water System Improvements (Re-Bid) | replacing two sections of the existing 6” water main currently suspended on the side of two bridges in The Town of Cumberland City. | 02/26/2026 | No Bidder Selected | N/A | Download Results |
| D-2024-2 | 2024 ARPA Dover Collection System Improvements | Rehabilitation of two sanitary sewer lift stations and approximately 2,900 LF of gravity sewer within the Town of Dover’s Collection system. | 11/08/2024 | Parchman Construction Company, Inc. | $624,353.16 | Download Results |
| DL-2025-1 | 2024 ARPA Dunlap Waterline Replacement | Replacement of several water mains throughout the Downtown Dunlap. | 03/27/2025 | HL Management Services, LLC | $373,177.00 | Download Results |
| HUD-2025-1 | 2024 ARPA Harbor Utility District Generator Installation | Installation of a new generator, all wiring, conduits, etc. as applicable in order to provide a backup power supply to Harbor Utility District’s Water Treatment Plant. | 02/27/2025 | RUBICON Construction & Engineering | $99,081.92 | Download Results |
| HUD-2025-2 | 2024 ARPA Harbor Utility District Water Treatment Plant Improvements | In-Kind replacement of the existing High-Service pumps at Harbor Utility Districts WTP and the Installation of a magnetic insertion meter to measure the treated water flow from the WTP. | 07/08/2025 | WASCON, Inc. | $56,421.77 | Download Results |
| HC-2025-3 | 2024 ARPA Houston County Health Department Sewer Improvements | Replacing approximately 50 LF of sewer piping both Inside and outside of the Health Department. | 07/01/2025 | RUBICON Construction & Engineering | $341,925.26 | Download Results |
| NJ-2025-1 | 2024 ARPA New Johnsonville Collection System Rehabilitation | Replacement of an existing lift station within the City of New Johnsonville’s wastewater collection system, along with the installation of a new force main to replace the existing, undersized force main that travels cross-country, and the lining of existing manholes with structural epoxy in problematic areas to reduce inflow and infiltration. | 07/31/2025 | Greenway Enterprise, LLC | $663,030.00 | Download Results |
| NJ-2025-2 | 2024 ARPA New Johnsonville Water System Improvements | Installation of (2) tank mixers in “Dupont” and “Lawson Hill” ground storage tanks, (1) automatic flushing valve on an existing dead end fire hydrant on Tripp Road, a 6” SDR-21 PVC water line on Autumn Lane, a 6” SDR-21 PVC water line on Apache Drive looping two 6” inch lines, and a 10” DIP water line under SR-70 via jack and bore. | 07/31/2025 | PLW Construction, LLC | $408,520.00 | Download Results |
| SCUD-2025-1 | 2024 ARPA South Cumberland Utility District Water Line Extensions | The extension of 7 public water lines throughout South Cumberland Utility District's (SCUD) service area. | 07/29/2025 | Ironwood Construction & Engineering, LLC | $3,850,555.00 | Download Results |
| D-2024-3 | 2024 ARPA The Trace Pump Station Rehabilitation | Rehabilitation of a water booster pump station within the Town of Dover that feeds an elevated storage tank. | 11/08/2024 | Parchman Construction Company Inc. | $125,829.00 | Download Results |
| WSUD-2025-1 | 2024 ARPA West Stewart Utility District Water Meter Installation | Installation of approximately 238 new Advanced Metering Infrastructure (AMI) technology water meters within West Stewart Utility District (WSUD) service area. | 06/18/2025 | Greenway Enterprise, LLC | $289,480.00 | Download Results |
| B-2025-1 | 2024 Bradford Creek Crossing and Loop | Installation of approximately 155 linear feet of 6-inch DR-11 HDPE water line underneath a creek in the City of Bradford. | 02/04/2025 | Mofield Brothers Construction Company, LLC | $124,550.00 | Download Results |
| J-2025-1 | 2024 CDBG Jamestown Sewer Improvements | Rehabilitation of one (1) sanitary sewer lift station, approximately 1,722 linear feet of gravity sewer, and nine (9) service cleanouts utilizing cured-in-place pipe (CIPP) methods, as well as the rehabilitation of six (6) manholes using a cementitious epoxy lining system, located in Jamestown, Tennessee. | 04/09/2026 | W&O Construction, Inc. | $563,115.00 | Download Results |
| NJ-2025-3 | 2024 CDBG New Johnsonville Collection System Improvements | Abandonment of irreparable section of Gravity Sewer and installation of approximately 391 linear feet of Gravity Sewer to re-direct flow. Additional sewer rehabilitation as alternates. | 06/24/2026 | No Bidder Selected | N/A | Download Results |
| D-2024-RFP-1 | 2024 Dover ARPA Water Meter Project | Replacement of existing water meters with AMI/AMR meters in the Town of Dover’s distribution system. | 10/24/2024 | Utilities One Inc. | $111,225.00 | Download Results |
| DL-2025-2 | 2024 Dunlap WTP Chlorine Gas to Sodium Hypochlorite Conversion | Conversion of Dunlap’s existing disinfection process from Chlorine Gas to Sodium Hypochlorite by installing custom chemical tanks and containment, and other required processes. | 06/24/2025 | No Bidder Selected | N/A | Download Results |
| AWB-2025-1 | 2024 ECWAG Ardmore Groundwater Well – Test Wells | Drilling four (4) test wells to determine if groundwater is available, the quality of the groundwater, and what the groundwater yields. | 04/02/2025 | National Water Services, LLC | $412,013.00 | Download Results |
| HC-2024-2 | 2024 Houston County Jail Force Main | Construction of approximately 1,722 LF 4-inch SDR-21 PVC force main for the Houston County Jail. | 01/09/2026 | Parchman Construction Company, Inc. | $103,200.00 | Download Results |
| N-20024-1 | 2024 Niota Water Storage Tank | Construction of a 48' diameter, 38' tall water storage tank for the City of Niota. | 11/14/2024 | Southeastern Tank, Inc | $1,561,431.45 | Download Results |
| P-2025-2 | 2025 ARPA Petersburg Isolation Valve Insertion | Insertion of approximately 10 water valves in the Petersburg water system without system shutdown by hot tap method. | 08/11/2025 | Greenway Enterprise, LLC | $112,770.00 | Download Results |
| P-2025-1 | 2025 ARPA Petersburg Storm Water Rehabilitation | Improving the Town of Petersburg’s stormwater collection systems by replacing Culverts along Church Street & High Street and grading ditches to promote the correct flow of the stormwater. | 05/01/2025 | No Bidder Selected | N/A | Download Results |
| P-2025-1 | 2025 ARPA Petersburg Storm Water Rehabilitation (Re-Bid #1) | Improving the Town of Petersburg’s stormwater collection systems by replacing Culverts along Church Street & High Street and grading ditches to promote the correct flow of the stormwater. | 06/26/2025 | No Bidder Selected | N/A | Download Results |
| P-2025-1 | 2025 ARPA Petersburg Storm Water Rehabilitation (Re-Bid #2) | Improving the Town of Petersburg’s stormwater collection systems by replacing Culverts along Church Street & High Street and grading ditches to promote the correct flow of the stormwater. | 08/11/2025 | Greenway Enterprise, LLC | $155,585.00 | Download Results |
| P-2025-3 | 2025 ARPA Petersburg Water Meter Project | Replacement of all existing water meters within the Town of Petersburg’s service area with new Advanced Metering Infrastructure (AMI) technology water meters. | 06/16/2025 | Griffin Contracting & Excavating, LLC | $125,808.40 | Download Results |
| HC-2025-2 | 2025 David L. Hardin Emergency Operations Center Uninterruptible Power Supply | Installation of a 25 kVA uninterruptable power supply (UPS) for the David L. Hardin Emergency Operations Center in Houston County, Tennessee. | 06/09/2025 | No Bidder Selected | N/A | Download Results |
| HC-2025-2 | 2025 David L. Hardin Emergency Operations Center Uninterruptible Power Supply (Re-Bid) | Installing a 25 kVA uninterruptible power supply (UPS) for the David L. Hardin Emergency Operations Center in Houston County, Tennessee. | 08/21/2025 | RUBICON Construction & Engineering | $32,083.00 | Download Results |
| D-2025-1 | 2025 Dover Annexation Gravity Sewer Extension | Extending an 8" gravity sewer along Donelson Parkway (State Route 79) approximately 2,200 Linear Feet to serve an area that is being annexed into the City Limits. | 04/03/2025 | PLW Construction LLC | $187,950.00 | Download Results |
| HC-2025-1 | 2025 Houston County Emergency Operations Center Structural Repairs | Structural rehabilitation of the David L Hardin Emergency Operations Center (approximately 4,000 SF) including foundation stabilization, concrete settlement repairs, and the correction and rerouting of gutter downspouts. | 03/28/2025 | Vintage Construction, LLC DBA The Foundation Specialists | $136,879.08 | Download Results |
| IDB-2025-1 | 2025 Stewart-Houston Industrial Park Road Improvements | Heavy duty asphalt paving of approximately 13,500 square yards of road in the Stewart-Houston Industrial Park. | 05/22/2025 | Byard Construction, LLC | $263,144.00 | Download Results |
| D-2025-2 | 2025 Town Of Dover Asphalt Overlay | Overlaying asphalt on two (2) roads within the Town of Dover’s city limits | 06/05/2025 | Pavement Restorations, Inc. | $123,238.00 | Download Results |
| SC-2026-RFP-1 | 2026 Stewart County EMS Station #1 Roof Replacement | Removal and replacement of the Stewart County EMS Station #1 roof | 05/28/2026 | Modern Heating, Cooling & Roofing, Inc. | $65,550.00 | Download Results |
| IDB-2026-1 | 2026 Stewart-Houston Industrial Park Road Improvements | Heavy duty asphalt paving of approximately 4,350 square yards of road in the Stewart-Houston Industrial Park. | 06/25/2026 | Byard Construction, LLC | 144,000.00 | Download Results |
| D-2026-1 | 2026 Town of Dover Lick Creek City Park Walking Trail Repair | — | ||||
| D-2026-1 | 2026 Town of Dover Lick Creek City Park Walking Trail Repair | The repair of a portion of the Lick Creek Walking Trail at Dover City Park. The portion of the walking trail has become deteriorated over time due to erosion. | 07/09/2026 | No Bidder Selected | N/A | Download Results |
| G-2025-1 | Greenfield 2024 CDBG Water Meter Replacement | System-wide replacement of existing water meters within the City of Greenfield’s service area with new Automated Meter Reading (AMR) water meters. | 04/23/2026 | FlowPros, LLC | $580,358.44 | Download Results |
| HC-2025-4 | Houston County Courthouse Additions and Alterations | A new two-story and basement addition and alterations to the Houston County Courthouse and related site improvements to include Telehealth, tech, conference, circulation, and support spaces and restrooms. | 08/12/2025 | Ryzec Building Group, LLC | $2,798,000.00 | Download Results |
| HC-2026-2 | Houston County Library Flooring Improvements | — | ||||
| SC-2026-2 | Stewart County Agricultural Pavilion | The construction of a 150-foot by 200-foot prefabricated metal agricultural pavilion at the Stewart County Fairgrounds. | 07/29/2026 | PTL Fabricators | $485,000.00 | Download Results |
| TAUD-2026-1 | T.A.U.D Training Station Restroom Expansion & Interior Alterations | Interior renovations and minor building additions at the Tennessee Association of Utility Districts (TAUD) Training Facility, including improvements to restrooms, training rooms, offices, and support spaces, along with architectural, plumbing, HVAC, and electrical upgrades, utility work, and related site improvements. | 08/20/2026 | 615 Elite Construction, LLC | 324,000.00 | Download Results |